High quality drilling fluid is not composed of one or two materials (such as
bentonite) . To keep the capability of the drilling fluids, it needs to add
various treatment agent, such as drilling fluid lubricant, high temperature
stabilizer, anti-sloughing agent.
According to the statistics in the year of
1992 , treatment agent series has increased to ten categories including 202
kinds, forming an important branch of oilfield chemistry. So the cost of
drilling fluid is pretty high. To save the cost of drilling, we need shear pump
and jet mud mixer to make up used drilling fluid for periodic duty.
Shear pump is used to effectively mix and hydrate material added into
drilling fluid. With large capacity, high lift, and long reliable service life,
the shear pump can speed up dilution and hydration of polymers to have property
mud. In drilling fluid recycling system, shear pump is very important solids control equipment.
In use process of shear pump, we should notice some details:
1. After using shear pump, we should use clear water flush pipeline and shear
pump, to avoid leftover block runner and nozzle of impeller.
2. Bearing bore is filled in grease about 10~20ml every other week,
combination seal cavity is filled in grease about 10~20ml every day.
3. In winter, if the pump will not used for a long time, drilling fluid in
pump shell should be discharged, to avoid drilling fluid freeze.
At the same time, jet mud mixer is used to make and mix drilling fluid to
change the density and viscosity. This device can satisfy the fluid weighting
and mixing of solids control system for 1500m-9000m drilling.
In use process of jet mud mixer, we also should notice some details:
1. General requirements mixing hopper capacity shall not be less than
150m3/h. For the larger tank and great pump motor power, we can also use the
mixing hopper with 300m3/h capacity.
In order to ensure the required well pressure, suggest that each drilling
crew should equipped with a spare set of mixing hoppers, in most cases spare
hoppers used overlap mode.
2. The return pressure of outlet pipe needed moderate, overlarge return
pressure will reduce the treating capacity of mixed hopper.
3. The gap between nozzle and venturi tube must be suitable, when reach
optimum efficiency, the gap is 32~90mm, usually don’t more than 90 mm, otherwise
the feed speed of barite will be significantly reduced.
4. Another important consideration of install equipment is the drilling fluid
required lifted height. If discharge needed to enter into different deck tank or
a taunt tank and hopper, mix rate will be decreased. When the height from 1.83m
to 3.66m, barite adding rate will be reduced to 17%. If the increased demand is
very high, the pump capacity is insufficient, mixed ability will be greatly
reduced.